Jun. 16th, 2016

low_delta: (mustang 03)
Nothing going on this week. Last week they got the doors in and the trim up. I'm surprised they didn't do final touch up on the paint first. The towel bars are on the wall. They took the dumpster away when the trim was done.

They're supposed to be bringing in the granite mid next week. Finish plumbing the next day. Glass very soon too, I hope. It was only supposed to be three weeks. That would be Monday.

Other than that, we need doorknobs and drawer pulls, one more hook on the door, touch up of the paint, and filling the nail holes in the trim.

Profile

low_delta: (Default)
low_delta

November 2025

S M T W T F S
      1
2345678
9101112 131415
16171819202122
23242526272829
30      

Most Popular Tags

Page Summary

Style Credit

Expand Cut Tags

No cut tags
Page generated Nov. 18th, 2025 03:23 pm
Powered by Dreamwidth Studios