Nothing going on this week. Last week they got the doors in and the trim up. I'm surprised they didn't do final touch up on the paint first. The towel bars are on the wall. They took the dumpster away when the trim was done.

They're supposed to be bringing in the granite mid next week. Finish plumbing the next day. Glass very soon too, I hope. It was only supposed to be three weeks. That would be Monday.

Other than that, we need doorknobs and drawer pulls, one more hook on the door, touch up of the paint, and filling the nail holes in the trim.

Date: 2016-06-17 10:28 am (UTC)From: [identity profile] pondhopper.livejournal.com
It will get done eventually. Has the shower door been installed?
We have had to leave the finishing of the downstairs bathroom for August when we get back. The door arrived but not the frames. So irritating. But there's nothing we can do about that. So, one more wall needs tiling (the door wall) and the door needs installing when we get the frames. Apparently you can't tile a wall that doesn't have a doorframe on it.

Profile

low_delta: (Default)
low_delta

February 2026

S M T W T F S
12 3 4567
891011121314
15161718192021
22232425262728

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Feb. 8th, 2026 11:36 pm
Powered by Dreamwidth Studios