May. 27th, 2016

low_delta: (faerie)
As mentioned, they finished grouting the shower a week ago today, and they templated the glass shower doors.

I had an issue with some of the grouting. It was uneven in color, and it was uneven in depth in the corners. They left a deep opening in some places, that seemed like they'd be a dirt drap. I got the project manager over to take a look, and she got someone to come out and fix it. They caulked the corners (which is what I expected it to be like in the first place).

The original printed schedule she gave us said it would be two weeks to get the granite countertop. Later on, she told me it would be three. I was a little unhappy about this. Then, the other night, she said "three to four". I was really unhappy about this. They came out and measured for it on the 11th. On the 16th, she sent us a drawing with the measurements to sign off on. We were in New York at the time, and we don't often check that e-mail account, so two days later she texted me to ask me to take care of it. And then it took another day to get it back to her. She says they can't place the order until my signature is submitted. So we lost a week there? I hope that's the source of the fourth week being added.

I also just noticed that the shower head and valve are off center. That's going to bother me.

And then the glass will also take three weeks.

Next week they're going to install the woodwork - doors and floor and window trim. Final plumbing and electric go in after the granite.

Profile

low_delta: (Default)
low_delta

June 2025

S M T W T F S
1234567
891011121314
151617 18192021
22232425262728
2930     

Most Popular Tags

Page Summary

Style Credit

Expand Cut Tags

No cut tags
Page generated Jun. 19th, 2025 04:46 am
Powered by Dreamwidth Studios