bathroom remodel
May. 19th, 2016 09:25 pmA week ago Monday (the 9th) was finishing the drywall. Then they primed and painted. Wednesday they set the vanity, and then made a template for the granite top. Friday, the guy started the tile in the shower. Last Saturday they did the floor tile. Today (Thursday) he finished setting the tile and will grout tomorrow. They'll do a template for the shower door glass tomorrow.
I'm not really sure what comes after that, or when. Doors, trim molding. Final electric. Plumbing fixtures and hookup will come after the vanity top, which could be as late as June 2nd.
I hope they do the doors soon. They took out the door into the bedroom, so there's just a sheet of plastic over the doorway, and it gets bright in the bedroom in the morning.
I'm not really sure what comes after that, or when. Doors, trim molding. Final electric. Plumbing fixtures and hookup will come after the vanity top, which could be as late as June 2nd.
I hope they do the doors soon. They took out the door into the bedroom, so there's just a sheet of plastic over the doorway, and it gets bright in the bedroom in the morning.