the sunday report
Dec. 6th, 2004 12:36 amI got the supply lines installed for the bathtub. Actually, it was only up to where I'm switching from galvanized to copper. Cyn got about half the insulation put up. Very cool. I've got way too much work to do before the drywaller starts. I'm disapointed because (as usual) I didn't get over there to start working until well after noon. And didn't work in the evening.
At least I got some stuff done here at home. Cyn and I set up the tree. Gotta love that centuries-old tradition of assembling the tree. Then I spent two or three hours organizing the basement. Looks pretty good.
At least I got some stuff done here at home. Cyn and I set up the tree. Gotta love that centuries-old tradition of assembling the tree. Then I spent two or three hours organizing the basement. Looks pretty good.