Jun. 28th, 2016

low_delta: (faerie)
Last week Wednesday, they installed the granite vanity top. Finally! I think it took five weeks even. The next day they did the finish plumbing, installing the sink, toilet and other fixtures. We also got a new toilet in the other bathroom. Friday was the glass shower doors. They didn't come back on Monday. They need to finish the trim, and touch up the paint. I think that's it?

Profile

low_delta: (Default)
low_delta

October 2025

S M T W T F S
   1234
5678 9 1011
12131415161718
19202122232425
262728293031 

Most Popular Tags

Page Summary

Style Credit

Expand Cut Tags

No cut tags
Page generated Oct. 15th, 2025 11:21 pm
Powered by Dreamwidth Studios