remodeling
May. 8th, 2016 10:19 amMonday the electrician finished. Tuesday was inspection and insulation. Wednesday they hung the drywall and mudded it. I don't think they did anything on Thursday. Friday they finished the drywall and sprayed the texture.
The schedule for Monday says they'll be finishing the drywall. So they probably won't be doing anything. Tile work starts Tuesday.
Today, I'm running some speaker wire, since the wall in the shower area is still open, and the entertainment center is on the other side of it. I'll take it up in the attic and run it to the other side of the room, for back surround speakers.
Our other shower has a leak. Water is seeping out where the floor plan meets the floor. It's caulked, but water is coming out anyway. There's no water leaking down to the basement, so that worries me - all the water is being kept inside. And we can't have anything done about it until the other bathroom is finished. And I'm not sure that we're going to be able to open it up, fix it and close it back up. It sounds like another full remodel. Our best hope is that it stops leaking when we stop using it.
The schedule for Monday says they'll be finishing the drywall. So they probably won't be doing anything. Tile work starts Tuesday.
Today, I'm running some speaker wire, since the wall in the shower area is still open, and the entertainment center is on the other side of it. I'll take it up in the attic and run it to the other side of the room, for back surround speakers.
Our other shower has a leak. Water is seeping out where the floor plan meets the floor. It's caulked, but water is coming out anyway. There's no water leaking down to the basement, so that worries me - all the water is being kept inside. And we can't have anything done about it until the other bathroom is finished. And I'm not sure that we're going to be able to open it up, fix it and close it back up. It sounds like another full remodel. Our best hope is that it stops leaking when we stop using it.