Monday the electrician finished. Tuesday was inspection and insulation. Wednesday they hung the drywall and mudded it. I don't think they did anything on Thursday. Friday they finished the drywall and sprayed the texture.

The schedule for Monday says they'll be finishing the drywall. So they probably won't be doing anything. Tile work starts Tuesday.

Today, I'm running some speaker wire, since the wall in the shower area is still open, and the entertainment center is on the other side of it. I'll take it up in the attic and run it to the other side of the room, for back surround speakers.

Our other shower has a leak. Water is seeping out where the floor plan meets the floor. It's caulked, but water is coming out anyway. There's no water leaking down to the basement, so that worries me - all the water is being kept inside. And we can't have anything done about it until the other bathroom is finished. And I'm not sure that we're going to be able to open it up, fix it and close it back up. It sounds like another full remodel. Our best hope is that it stops leaking when we stop using it.

Profile

low_delta: (Default)
low_delta

June 2025

S M T W T F S
1234567
891011121314
15161718192021
22232425262728
2930     

Most Popular Tags

Page Summary

Style Credit

Expand Cut Tags

No cut tags
Page generated Jun. 13th, 2025 10:02 am
Powered by Dreamwidth Studios