Apr. 25th, 2016

low_delta: (faerie)
The bathroom remodel has started. Finally.

We have two bathrooms, but the second one is tiny. It's like a half bath, because you can hardly see the tiny closet of a shower stall. There's no vanity - just a sink, toilet and floor for you to place your things. And no place to store them, so I have all my things in a box. When I go in to take my shower in the morning, I grab the box and my towels from the laundry room. Box goes on the toilet seat, and clean clothes, dirty clothes and towels go on the floor. I've got to put some hooks up, at least.

And it's going to be like this for about a month and a half. They gave us a tentative schedule. Demolition is two days, rough plumbing one, rough electrical one day, then insulation one day. All this has to be done by next Tuesday, because that's the day that our town's inspector works. *rolls eyes*

Some of this stuff is custom. After the walls are done, and the floor is done, they set the vanity in place, and then they can do the final measurements for the granite top. And that can take up to two weeks. Same situation for the glass shower doors, but it won't take that long.

Profile

low_delta: (Default)
low_delta

November 2025

S M T W T F S
      1
2345678
9101112 131415
16171819202122
23242526272829
30      

Most Popular Tags

Page Summary

Style Credit

Expand Cut Tags

No cut tags
Page generated Nov. 17th, 2025 01:28 pm
Powered by Dreamwidth Studios